The table below shows the compulsory and optional units for completion of the Gas Network Operations Level 2 (Service Layer) qualification. A complete printable chart of required and optional units for all levels of GNO is attached to this page.

 

Compulsory Units

NumberDescription
201029Locate & avoid supply apparatus & sub-structures during gas network operations
202030Excavate holes & trenches in ground & pavement structures to access the gas network
203031Re-instate excavation & pavement surfaces after gas network operations
204032Contribute to an efficient and effective work environment during gas network operations
205033Contribute to health, safety & environment in the workplace during gas network operations
206034Operate powered tools and equipment during gas network operations
212s035Install engineering products or assets (Servicelaying)
213s036Replace assembly or sub assembly components (Servicelaying)
214s037Conduct specified testing of engineering products or assets (Servicelaying)

 

 

Optional Units

(* = suggested optional units)

NumberDescription
207s40* Join material by manually controlled thermal processes (Servicelaying)
208s42Control allocated resources to achieve requirements (Servicelaying)
20938Prepare resources & segregate the area for highway works during gas network operations
21039prepare resources & segregate the area for site works during gas network operations
211s41* Join materials by machine controlled thermal processes (Servicelaying)
215s43Prepare work areas & materials for engineering activities (Servicelaying)
216s44* Restore components to operational condition by repairs (Servicelaying)
217s45Contribute to the organisation of work activities (Servicelaying)